Technical review
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
Our role can start with a developed design or an open brief. In both cases, we identify the technical questions, document the agreed answer and coordinate manufacture with the programme.
Send us the available documentation, location, units and target date
The scope can begin with a defined design or with a still open need. We confirm what documentation exists and what decisions are missing before manufacturing
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
We adjust construction solutions, thicknesses, machining and hardware to the intended use
Manufacturing according to documentation and finishes validated before starting
We plan delivery, access, fitting, adjustments and review of installed parts
The dialogue, level of detail and planning change depending on who coordinates the work and how the furniture must be delivered.
We turn the design intent into a solution that can be measured, manufactured and installed to the agreed detail
We integrate the custom carpentry into the renovation schedule and review the conditions before fitting
We organize typologies, units and phases to be able to value the furniture with a comparable and documented scope
We assess furniture projects for rooms and common areas based on frequent use, cleaning and maintenance.
We study commercial furniture that combines display, storage, brand image and real conditions of the premises
We propose solutions for homes intended for sale or rent according to the typology, use and planned investment.
Tell us who coordinates the work, what furniture you need and what documentation exists. We will review the case by scope, not by label
Each milestone reduces uncertainty and leaves a record of what is manufactured, how it is finished and under what conditions it is installed.
Plans, measurements, units, finishes, location and planned schedule
Technical queries, exclusions, alternatives and outstanding information
Final measurements, samples, hardware, details and fitting conditions
Manufacture, control, delivery, installation and agreed adjustments
It is not necessary for all documentation to be closed. We review what is available and point out exactly what information is missing to continue
What parts should be manufactured and if there are repeated typologies
Plan, elevations, details or approximate dimensions for a first review
Prescribed finishes or visual references to propose a viable equivalence
town or area, access routes, phase of work and target installation date
The final scope is confirmed after reviewing the documentation and actual project conditions
Yes. We review the documentation, detect manufacturing doubts and confirm details, materials, fittings, measurement and fitting before assessing the final scope
Yes, as long as it is defined what part of the development we assume. We can propose constructive solutions and materials compatible with the use and the planned investment.
Yes. We need to know typologies, quantities, location, delivery sequence, storage and installation conditions
Measurements, configuration, materials, finishes, fittings, relevant junctions, economic scope and transport and installation conditions
Local knowledge helps with logistics, but the room still decides the design. We treat the address in Torremolinos as the start of an investigation, never as a shortcut to a standard answer.
A sketch is welcome, but it is not compulsory. Current drawings, finish intent, programme dates and known access constraints usually reveal enough to separate the immediate need from ideas that can wait.
Reference images help us read taste, not copy dimensions. We mark what you like about them—perhaps the calm fronts, open display or timber tone—and test only that idea against the room.
Approximate measurements help us judge scale. Production dimensions are different: they are taken at the points that control doors, fillers, worktops, services and the route into the room.
Module divisions are checked against both the elevation and the installation route. A technically convenient joint still needs to look deliberate once the doors are closed.
The project manager filters the options before presenting them. You see credible alternatives with an explanation of what changes in feel, upkeep and price—not a catalogue without context.
Maintenance is discussed in ordinary language: what marks, what wipes clean, what can be touched up and what is likely to age visibly.
A beautiful elevation is not enough if it cannot enter the building or be adjusted safely. The fitting sequence is considered while the drawings can still respond.
Scribes and final adjustments are allowed for rather than treated as surprises. That is how a fitted piece meets the building without looking forced.
Phasing can be sensible, particularly when several rooms are involved. What matters is deciding the sequence before one early choice limits a later room.
When comparing options, we keep the underlying layout stable. Otherwise a cheaper or dearer figure may be describing a different piece of furniture altogether.
The aim of the first exchange is simple: give the project a sensible direction without manufacturing certainty that does not yet exist.
Before production, the confirmed information is brought together. Scattered messages are useful during discussion, but the workshop works from one current set of decisions.
Share plans, units, location and target date. We will tell you the next step